


- 2–3 wksto submission
- 1–2 motypical approval
- 3revision rounds
Villa design in Dubai
Schematic design and a permit set submitted in two to three weeks, by the architects behind Aldar's villa studies.
Our architects have designed for
What can your plot hold?
Give us the plot and the community. The architect replies within one working day with the footprint, height and floors it allows. Already own the villa? See renovation.

Three weeks to submission
Typical G+1 villa. Your proposal gives you the same chart with your dates.
Authority approval then usually takes one to two months, depending on the authority.
What's in, what's extra
The core fee gets you to a submitted permit. Add-ons are listed separately in your proposal, so you pay only for what you choose.
| Item | Fee | Notes |
|---|---|---|
| Site and rules analysis | Core | Setbacks, coverage, height, community guidelines |
| Concept and schematic design | Core | Plans, sections, elevations |
| Three revision rounds per stage | Core | Further rounds agreed and charged up front |
| Permit drawing set | Core | Coordinated with structure and MEP |
| Submission and authority comments | Core | Through our licensed partner, until issue |
| 3D renders and walkthrough | Add-on | See every room before you approve |
| Construction drawings | Add-on | Details contractors can price |
| Interior design | Add-on | Layouts, finishes, joinery |
| Landscape design | Add-on | Garden, pool deck, shade |
Planned for life here
- A majlis guests reach directlyIts own entrance and washroom, so visitors never cross family space.
- Privacy from neighboursWindows, screens and courtyards placed so the curtains can stay open.
- Shade firstDeep overhangs, shaded terraces, little west-facing glass.
- Staff and service planned inMaid's and driver's rooms with a service entrance from day one.
- Two kitchensA show kitchen for the family, a working kitchen behind it.
- Room to growStructure sized for a future floor where your plot allows.

Built by contractors you choose
We tender your job to our trusted contractors across Dubai. You see each contractor, their past jobs and their price for your project side by side, then pick the best fit, or we recommend one.

Any style, same discipline
Sculpted

Earth

Curved


Studies our architects drew for Aldar, from soft white curves on an island to timber and earth in Abu Dhabi.
Where we work
Dubai
- Dubai Hills Estate
- Emirates Hills
- Al Barsha
- Jumeirah
- Umm Suqeim
- Al Furjan
- Tilal Al Ghaf
- Arabian Ranches
- Palm Jumeirah
- Mirdif
Abu Dhabi
- Saadiyat
- Yas
- Al Reem
- Shakhbout City
- Khalifa City
Other emirates
- Sharjah
- Ajman
- Ras Al Khaimah
- Umm Al Quwain
- Fujairah
Approvals
- Master developer NOC
- Building permit
- DEWA
- Civil Defence
Villa design, answered
- Proposal within 48 hours of your call.
- Two to three weeks to submission.
- Three revision rounds in every stage.
What does a villa design cost?
It depends on plot size, floors and scope. After a short call you get a fixed fee per stage in writing within 48 hours, so you can decide stage by stage.
How fast can my permit be submitted?
Two to three weeks from approving your proposal, for a typical villa. Approval then usually takes one to two months, depending on the authority.
Do I need a plot first?
Ideally. If you are still choosing, we check your shortlisted plots before you commit and tell you what each can hold.
Who builds it?
We tender your job to our trusted contractors across Dubai. You see each contractor, their past jobs and their price for your project side by side, then pick the best fit, or we recommend one.
What if I don't like the first design?
Every stage includes three revision rounds. Any further rounds are agreed and charged up front, never as a surprise.


Send the plot. We'll tell you what it can hold, then draw it.
Dubai, United Arab Emirates. We reply within one working day and send a fixed-fee proposal within 48 hours of your call.

